100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
MIS 3320 FINAL - Sanchez Questions with 100% Actual correct answers | verified | latest update | Graded A+ | Already Passed | Complete Solution $7.99   Add to cart

Exam (elaborations)

MIS 3320 FINAL - Sanchez Questions with 100% Actual correct answers | verified | latest update | Graded A+ | Already Passed | Complete Solution

 8 views  0 purchase
  • Course
  • Institution

MIS 3320 FINAL - Sanchez Questions with 100% Actual correct answers | verified | latest update | Graded A+ | Already Passed | Complete Solution

Preview 2 out of 9  pages

  • June 19, 2024
  • 9
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
avatar-seller
MIS 3320 FINAL - Sanchez
What is a system analyst? - ANS-responsible for the analysis and design of information
systems; translates a business problem into an information system solution; like an
architect

SDLC - what is it? - ANS-Framework that identifies all the activities required to
research, build, deploy, and often maintain an information system

Predictive approach - ANS-Requirements well understood and well defined, low
technical risk, can be planned in advance, system can be developed according to the
plan; Client knows what they want

Adaptive approach - ANS-Requirements and needs uncertain, high technical risk,
iterative, must be flexible and adapt (spiral model and iterative development); Client
does NOT know what they want

Waterfall model - ANS-One phase begins when another phase completes;
specifications are frozen problems; system requirements locked in; limited user
involvement

Modified waterfall - ANS-The modified waterfall allows for phases to overlap as well as
the ability to go backwards; shortened the development time - faster

Spiral model - ANS-Iterative approach; spiral until project completed then deploy; client
is able to see something sooner; multiple feasibility checkpoints

Incremental development - ANS-Iterative approach; system is built in small increments
and partially deployed in certain steps; as integration is completed, it is integrated to the
whole - some functionality gets into the user's hands much earlier

Agile Development - ANS-A guiding philosophy and set of guidelines for developing
information systems in an unknown, rapidly changing environment

Coupling - ANS-Qualitative measure of how closely the classes in a design class
diagram are linked; strive for low level

Cohesion - ANS-the consistency of the functions within a single class and is a
qualitative measure of its focus or unity of purpose; strive for high level

, Methodologies - ANS-comprehensive guideline to follow for completing every SDLC
activity; describe everything the developer needs to produce

Tools - ANS-Software to create models or other project components (record info to write
code)

Techniques - ANS-A collection of guidelines that specify a method for how to carry out a
development activity or task (how team will do the work)

Models - ANS-Abstraction used to separate out aspect like diagrams (specify
requirements)

Main purpose of analysis - ANS-Understand and specify what needs to be
accomplished

Main purpose of design - ANS-defines and describes the system which solves the need

Scrum - ANS-objective to be quick, agile, and intense at to go the entire distance.
Responsive to high changing dynamic environments (some projects never reach
completion)

What is a sprint? - ANS-a time controlled mini-project that implements a specific portion
of a system; scope cannot be changed; usually 2 weeks

Scrum Master - ANS-Scrum project manager - ensures the team follows the Scrum
process (a process owner not a product owner); a facilitator; removes impediments;
resolves issues

Product Owner - ANS-client stakeholder who controls the product backlog; prioritizes it

Development Team - ANS-responsible for building the increment; 5 to 9 members with
cross-functional skills; self-organizing teams

What happened with the Project Leader role? - ANS-Scrums do not employ project
managers because the development team is self organizing

Product Backlog - ANS-a prioritized list of user requirements used to choose work to be
done in a Scrum project; i.e. user stories

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Hkane. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $7.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

75632 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$7.99
  • (0)
  Add to cart