100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Class C Waste water Exam A-graded Final Certification Exam $10.69   Add to cart

Exam (elaborations)

Class C Waste water Exam A-graded Final Certification Exam

 1 view  0 purchase
  • Course
  • Institution

Class C Waste water Exam A-graded Final Certification Exam The Activated Sludge Process: A. requires preaeration B. requires Activated Carbon C. is an aerobic biological process. D. Usually precedes primary sedimentation. E. Requires 50% by volume old sludge to work effectively. C. Is an A...

[Show more]

Preview 2 out of 9  pages

  • June 12, 2024
  • 9
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
avatar-seller
Class C Waste water Exam A-graded Final
Certification Exam
The Activated Sludge Process:

A. requires preaeration
B. requires Activated Carbon
C. is an aerobic biological process.
D. Usually precedes primary sedimentation.
E. Requires 50% by volume old sludge to work effectively.
C. Is an Aerobic biological process


A complete mix activated sludge plant has a fast settling sludge and high amounts of pin floc leaving
the clarifier. One way to correct this problem is to :

A. Increase the RAS Flow
B. Reduce Wasting Rates
C. Increase dissolved oxygen levels.
D. Increase the F/M ratio by wasting more
E. Increase the sludge age by wasting less.
D. Increase the F/M Ratio by Wasting More


Which of the following flow rates should be measured if the operator is to control plant properly?

A. Aeration rate or resulting dissolved oxygen level.
B. Influent or effluent.
C. return sludge
D. waste sludge
E. all the above
E. all the above


During start up your aeration tank produces excessive amounts of billowing white foam. This can be
corrected by:

A. Doing nothing, it will go away in a few hours
B. Increasing the sludge wasting rate
C. Seeding the process with sufficient good quality sludge
D. Spraying water on the foam until it is gone
E. Taking a weeks vacation
C. Seeding the process with sufficient good quality sludge


In solving an operational problem at a treatment plant:

A. there is almost always a good technical solution. It may require considerable experience and time
to learn whaat it is.
B. Human errors have to be corrected since the operator is at fault.
C. don't let the laboratory personnel influence you're judgement as to what the best solution is.
D. standard textbooks in sanitary engineering are the best source of information.
E. It is best to do nothing until the TNRCCC sends a violation notice.
A. there is almost always a good technical solution. It may require considerable experience and time
to learn whaat it is.

, When the return sludge rate is too low, what happens?

A. the aeration tank will not fill
B. There will be insufficient organisms to treat the wast load entering the aeration basin
C. the activated sludge in the aerator will starve.
D. the sludge blanket in the secondary clarifier could become too high.
E. B and D
E. B and D


What factors affect how well the mixed liquor suspended solids settle in the final clarifier?

A. flow velocity and or turbulence
B. temperature
C. quality of the mixed liquor solids
D. Short circuiting
E. All of the above
E. All of the above


The Active sludge process parameters which n operator can change directly are:

A. aeration rates.
B. waste rates.
C. the ratio of free swimming to stalked ciliates.
D. Return sludge rates.
E. All the above except C.
E. All the above except C.


Which of the following would you use to increase the degree of nitrification in an activated sludge
plant?

A. increase the wast rates
B. increase dissolved oxygen levels and increase the sludge age
C. Remove excess alkalinity from the wastewater
D. Maintain a thicker sludge blanket n the clarifier
E. Inhibit the growth of the nitrifying bacteria with chemicals.
B. increase dissolved oxygen levels and increase the sludge age


The Maximum change in the sludge wasting rates to maintain uniform operating conditions should be
about

A. 10- 20 % per day
B. 20-40 % per day
C. 40-60 % per day
D. 60-80 % per day
E. 100% per day
A. 10- 20 % per day


When operating an activated sludge plant, Which TSS concentration is most important for process
control?

A. Primary effluent
B. Aeration tank mixed liquor.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller ACADEMICAIDSTORE. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $10.69. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

75323 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$10.69
  • (0)
  Add to cart