Exam (elaborations)
GROUNDING BONDING 2 FINAL
- Course
- Institution
T/f Specific methods of bonding of metal raceways installed in a hazardous (classified) location are required even if there is an EGC or equipment bonding jumper installed inside the raceway. True The NEC has special requirements for grounding and bonding in hazardous (classified) locations. Thes...
[Show more]