Stationary Engineer GUARANTEED EXAM 2024 WITH 100% ACCURATE ANSWERS
- Course
- Institution
How much clearance from the top of the boiler is needed for a HP boiler that produces 70000 lbs of steam? - correct answer 7 feet On a gas fired boiler what is the proper gas to air mixture - correct answer 30%-70% and in special arrangements it can be as high as 100% . ANSWER CHAPTER 11 remembe...