Exam (elaborations)
Roadway Worker Protection Correct Questions & Answers(RATED A)
- Course
- Institution
Foul Time - ANSWER A method of establishing working limits on a main track, secondary track or controlled siding. in which a roadway worker is notified by the train dispatcher through the block operator that no trains will operate within the working limits established on that track until the roadwa...
[Show more]