100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
NASCLA AND GENERAL CONTRACTOR A EXAM, 170 QUESTIONS WITH 100% CORRECT ANSWERS 2024, WITH COMPLETE SOLUTION. $14.49   Add to cart

Exam (elaborations)

NASCLA AND GENERAL CONTRACTOR A EXAM, 170 QUESTIONS WITH 100% CORRECT ANSWERS 2024, WITH COMPLETE SOLUTION.

 1 view  0 purchase
  • Course
  • Institution

NASCLA AND GENERAL CONTRACTOR A EXAM, 170 QUESTIONS WITH 100% CORRECT ANSWERS 2024, WITH COMPLETE SOLUTION. In built up roofs, cant strips shall extend how many inches up the vertical surface? 5" Air entertainment should always be specified for concrete exposed to what? Freezing and thawing ...

[Show more]

Preview 2 out of 15  pages

  • March 13, 2024
  • 15
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
avatar-seller
NASCLA AND GENERAL CONTRACTOR A EXAM, 170
QUESTIONS WITH 100% CORRECT ANSWERS 2024,
WITH COMPLETE SOLUTION.

In built up roofs, cant strips shall extend how many inches up the vertical surface?

5"

Air entertainment should always be specified for concrete exposed to what?

Freezing and thawing

In a post tensioning environment, when a two-stroke pull is required, the final pull should be pre-
calculated to use no more than what percentage of the full stroke of the jack on the final pull?

60%

Tack or spot welding can reduce the strength of a bar to what percent of its original capacity?

35 - 40 %

The advantage of nuclear compaction testing is?

You do not have to remove the soil from the site

how many gallons of flammable liquids shall be stored in a room outside of an approved storage
cabinet?

25

A ______ bond will ensure the contractor that wins the project will draw up and put into action the
contract at the bid price and submit performance and payment bonds.

Bid

A ______ bond promises that the contract will stay within the bounds of the contract until completion.

Performance

A bond that ensures the subcontractors and suppliers for a specific project will get paid and will liens
from being enforced on said project.

Labor and Material Payment

_______ ______ Insurance will safeguard the contractor just in case there is devastation or loss to a
project before completion.

Builders Risk

________ ________ will keep the claim amount from being more than the dollar amount covered by
regular general liability or vehicle insurance.

, Umbrella Liability

Name one of the persons responsible for creating a estimate for a job.

Project Manager, Superintendent

The part of a project, when creating a estimate, that is the toughest to plan for is the _____ _______.

labor productivity

The percentage of lumber used for framing that is typically wasted is ______.

10%

Name one of the fundamental types of scheduling.

Bar Chart, Network Diagram, Critical Path Schedule

A _____ will show all of the activities that have to be completed in order for a project to be finished.

WBS, Work Breakdown Structure

When working on a project there are certain things that must be done but are not on a deadline to
complete, meaning it has a flexible schedule. What term would describe that flexibility?

float time

A _____ ______ contract will allow the Owner a choice to reimburse the contractor when supplies are
utilized within the scope of the project instead of when they are on the property.

Fixed Price

Just In Time delivery has a couple of benefits, name one of them

Reduces risk of loss, prevents job site congestion

Submitting that are to be provided in the last design phase include: (mark the best answer)

charts, drawings, samples, all of the above

An FOB (Free On Board) Job Site increases the contractor's liability of supplies being lost or damaged.

False

A ______ _____will keep track of the submittal process to anyone associated with the project, such as
subcontractors or orders for materials.

Expediting Log

A _____ ______ will keep track of a submittal and number each one of them.

submittal register

A _____ _____ payment is figured in such a way that could sometimes cause an overage of the amount
actually due on the contract terms.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller ACADEMICAIDSTORE. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $14.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

77254 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$14.49
  • (0)
  Add to cart