What are the five phases of commissioning? - ️️1.) Pre-Design 2.) Design 3.) Construction 4.) Acceptance 5.) Post-Acceptance Studies indicate _ to _% savings in building operating costs when comparing a comissioned building to a non-commissioned building. - ️️8 to 20% What is comm...