100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
NEBOSH NCC1 EXAM STUDYGUIDE 2024 $9.49   Add to cart

Exam (elaborations)

NEBOSH NCC1 EXAM STUDYGUIDE 2024

 4 views  0 purchase
  • Course
  • NEBOSH NCC1
  • Institution
  • NEBOSH NCC1

NEBOSH NCC1 EXAM STUDYGUIDE 2024...

Preview 3 out of 30  pages

  • January 3, 2024
  • 30
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
  • NEBOSH NCC1
  • NEBOSH NCC1
avatar-seller
luzlinkuz
NEBOSH NCC1 EXAM STUDYGUIDE 2024 Construction issues - ANSWER Transitory nature of workers Temporary nature of construction activities and the constantly changing workplace Time pressures from clients and principal contractors Weather conditions Levels of numeracy and literacy of workers Non-English speaking workers High risk areas for injuries in construction - ANSWER Falls from height Slips, trips and falls Being struck by falling/moving objects Manual handling Construction (Design and Management) Regulations 2007 - ANSWER Apply to all construction projects Duties placed on clients, designers and all construction workers CDM regs - notifiable projects - ANSWER Construction phase will last longer than 30 days Construction phase will involve more than 500 person days at work Duty holders for notifiable projects - ANSWER Client - have most influence Designers - have responsibility beyond construction phase Contractors - competence CDM Co-ordinator - advise client of their duties, co- ordinates others Principal contractor - safe working, co- ordination and co-operation betw een contractors CDM client duties - ANSWER Appoint competent persons Ensure suitable mgmt of welfare Allow sufficient time and resources Provide pre-construction info Appoint duty holders for notifiable projects Retain and provide access to health and safety file CDM co-ordinator CDM duties - ANSWER Advise and assist client with their duties Notify HSE Co-ordinate H&S aspects of design work and co-operate with others Facilitate good communication Liaise with principal contractor re ongoing design Pass on pre-construction information Prepare/update H&S file Designer CDM duties - ANSWER Check client is aware of their duties Eliminate hazards and reduce risks during design Provide information about remaining risks Check CDM co-ordinator has been appointed Provide any information needed for H&S file Principal contractors CDM duties - ANSWER Plan, manage and monitor construction phase Prepare, develop and implement a written plan and site rules Give contractors relevant parts of the plan Provide suitable welfare facilities Check competence of all appointees Site inductions and further info and training Consult with workers Liaise with CDM-c Secure the site Contractor CDM duties - ANSWER Check client aware of duties Plan, manage and monitor own work and that of workers Check competence Train own employees Comply with part 4 of CDM regs Ensure adequate welfare facilities Co-operate with principal contractor Pre-construction information - ANSWER Description of the project Management requirements and provisions Environmental restrictions and existing risks on site Design and construction hazards Health and safety file Construction phase H&S plan - ANSWER Relevant info from pre-construction information Project description and programme or works with key dates Identify the organisation in place (mgmt structure, responsibilities and "who does what") Identify arrangements in place to manage H&S risks Show how construction work will be co-ordinated and how consultation will be achieved Contain the H&S file Health and safety file contains: - ANSWER Brief description of the work carried out As built dwgs Survey info (e.g. Asbestos) and groundwork plans Location of services

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller luzlinkuz. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $9.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

75632 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$9.49
  • (0)
  Add to cart