Exam (elaborations)
Test bank For Systems Analysis and Design 6th Edition by Alan Dennis-Test Bank
- Course
- Institution
1. The line between analysis and design is sometimes very blurry. One reason is that : a. Object-oriented methods are generally fuzzier as compared to waterfall methods b. there is inadequate funding for the analysis phase to do a complete analysis c. analysts are generally rushed to complete th...
[Show more]