100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
IRC 2018 Exam with COMPLETE SOLUTION | 100 Questions with 100% Correct Answers $10.99   Add to cart

Exam (elaborations)

IRC 2018 Exam with COMPLETE SOLUTION | 100 Questions with 100% Correct Answers

1 review
 15 views  1 purchase
  • Course
  • Institution

The purpose of this code is to establish _________ requirements to safeguard the public safety, health and general welfare. - minimum 2018 IRC Section R101.3 Intent. Where, in any specific case, different sections of this code specify different materials, methods of construction or other requiremen...

[Show more]

Preview 3 out of 16  pages

  • November 4, 2022
  • 16
  • 2022/2023
  • Exam (elaborations)
  • Questions & answers

1  review

review-writer-avatar

By: jjpaez123 • 3 months ago

It seems someone just copied and paste this questions from another exam

avatar-seller
IRC 2018 Exam with COMPLETE SOLUTION | 100 Questions
with 100% Correct Answers
The purpose of this code is to establish
_________ requirements to safeguard
the public safety, health and general
welfare. Correct Answer: minimum

2018 IRC Section R101.3 Intent.

Where, in any specific case, different
sections of this code specify different
materials, methods of construction or
other requirements, the most _________
shall govern. Correct Answer: restrictive

2018 IRC Section R102.1 General.

Where a referenced code or standard
includes subject matter that is within
the scope of the IRC, the provisions of
the _________ shall take precedence. Correct Answer: IRC

2018 IRC Section R102.4.2 Provisions in referenced codes and standards.

An alternative material or method shall be approved where the proposed design is _________
and complies with the _________ of the code. Correct Answer: satisfactory
intent

2018 IRC Section R104.11 Alternative materials, design and methods of
construction and equipment.
Copyright

Compliance with the specific _________
-based provisions of the International
Codes in lieu of specific requirements
of the IRC shall be permitted as an
alternative. Correct Answer: performance

2018 IRC Section R104.11 Alternative materials, design and methods of construction and
equipment.

A permit is not required for one-story
detached accessory structures,
provided that the floor area does not
exceed _________ square feet. Correct Answer: 200

,2018 IRC Section R105.2 Work exempt from permit, Building: Item 1.

Fences that are _________ feet or less in
height do not require permits. Correct Answer: 7

2018 IRC Section R105.2 Work exempt from permit, Building: Item 2.

A permit is not required for the
replacement of branch circuit
overcurrent devices (breakers) of the
required capacity in the same location
(within a panel). Correct Answer: True

2018 IRC Section R105.2 Work exempt from permit, Electrical: Item 3.

Unattached decks not exceeding
_________ square feet in area, that are
not more than _________ inches above
grade, do not require a permit. Correct Answer: 200
30

2018 IRC Section R105.2 Work exempt from permit, Building: Item 10.

Where equipment replacements and
repairs must be performed in an
emergency situation, the permit
application shall be submitted within
the _________ _________ business day. Correct Answer: next working

...to the building official.

2018 IRC Section R105.2.1 Emergency repairs.

An application for a permit for any
proposed work shall be deemed to have
been abandoned _________ days after
the date of filing. Correct Answer: 180
180 days also applies to extensions.

2018 IRC Section R105.3.2 Time limitation of application.

Before issuing a permit, the building
official is _________ to examine or
cause to be examined buildings,
structures and sites for which an

, application has been filed. Correct Answer: authorized

2018 IRC Section R105.9 Preliminary inspection.

Where the building official issues a
permit, the construction documents
shall be approved in writing or by a
stamp which states _________
_________ _________ _________ . Correct Answer: REVIEWED FOR
CODE COMPLIANCE

2018 IRC Section R106.3.1 Approval of construction documents.

Final inspection shall be made after the
permitted work is _________ and prior
to _________ . Correct Answer: complete
occupancy

2018 IRC Section R109.1.6 Final inspection.

If located in a flood hazard area, the
documentation of elevations required
in Section R322.1.10 shall be submitted
to the building official prior to the
_________ inspection. Correct Answer: final

2018 IRC Section R109.1.6.1 Elevation documentation.

Signifies access that requires the removal of an access panel or similar removable obstruction.
Correct Answer: Access (to)

Ready Access (to) signifies access without the necessity for removing a
panel or similar obstruction

2018 IRC Section R202 Definitions.

A finished or unfinished habitable
space within an attic. Correct Answer: Attic, Habitable

Other conditions relating to occupiable floor area must also be met.

2018 IRC Section R202 Definitions.

Hot water is water at a temperature
greater than or equal to _________ °F. Correct Answer: 110

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller HIGHFLYER. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $10.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

75759 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$10.99  1x  sold
  • (1)
  Add to cart