Cmgt 3500- Final Exam Pt.1 End Of Chapter Questions And Answers

 3 views  0 purchase
  • Course
  • Institution

Cmgt 3500- Final Exam Pt.1 End Of Chapter Questions And Answers

Preview 2 out of 9  pages

  • September 13, 2022
  • 9
  • 2022/2023
  • Exam (elaborations)
  • Questions & answers
avatar-seller
Cmgt 3500- Final Exam Pt.1 End Of Chapter
Questions And Answers
List several measures that describe the size of the construction industry Correct Answer: - accounts
for 2/3 of $1-trillion in expenditures per year in new construction

- constitutes about 5% of GDP

-6% (7.5 mill) of workers of the industrial workforce is employed directly in the construction industry

-the construction industry represents the largest single production activity in the American economy

Under what conditions might the funding of public construction projects be particularly high? Correct
Answer: periods of recession

Why is the construction industry referred to as an easy entry and easy exit industry? Correct Answer:
high growth rate in construction

Low capital requirements

Little absolute cots or profit advantage for established firms

Most states have no rigid licensing requirements or fees

What are the ramifications of the cyclic tendencies experienced in the construction industry? Correct
Answer: some firms exit the industry without the benefit of choice, they fail.

Periods of recession, weak local economy , competition increases, causing profit margins to
decrease which results in failure of construction companies

Contrast the financing of public versus private construction projects? Correct Answer: private:
Funded through:
-expenditure of existing capital
-direct loans from outside creditors
-sale of fixed assets
-issuance of additional shares of stock/corporate bonds
-endowments

Public:
Funded through:
-appropriations from annual operating budgets (general taxation)
-special taxation assessments for specific purposes
-bond issues for specific purposes
-endowments

What are some advantages and disadvantages of the general contract approach? (design-bid-build)
Correct Answer: Advantages:
-gives the owner a firm idea of the final costs of the project

, -GC has skills that should reduce cost to owner
-GC maintains a staff of trained supervisors
-clearly defined roles for each contracting party

Disadvantages:
-often extends project duration
-owner does not have an agent involved in contractual arrangements
-leads to tight bids and small profit margins
-exposes owner a greater probability to claims

Discuss the criticisms that have been made of public agencies performing construction services by
the self-performance or force account method Correct Answer: -instances in which the public owner
submitted a bid on competitively bid projects, owner is frequently the low bidder
-other cases; owner does not permit private contractors to submit bids- the contractors state they're
placed at an unfair disadvantage
-say that owners do not charge properly for the costs of owning and operating heavy equipment

What type of project might be ideally suited for the design-build or design-construct method? Correct
Answer: popular in constructing large, industrial type projects

No extensive design on which to compute a bid

It is possible to begin construction before completion of the design for the project

What are the advantages of using the professional construction management approach? Correct
Answer: to the owners benefit

CM gives the owner a GMP that the project cost will not exceed

Permits flexibility for changing the project as the design evolves

Fast-tracking projects are good for this approach

Which types of contractual arrangements lend themselves to fast-tracking? Correct Answer: projects
to be delivered quickly

What general rule is followed when one party to a contract wants to cancel the contract, even though
the second party has already performed a portion of or all the obligations under the contract? Correct
Answer:

Give a construction example of a unilateral contract, and a bilateral or a mutual contract. Correct
Answer: unilateral: a one-sided contract in that only one of the contracting parties makes a promise,
while the other party exchanges something other than a promise, (performance)

Bilateral: an agreement created by mutual promises made by the contracting parties. Each party
plays two roles: promisor and promisee. Most construction projects are bilateral

Give an example of an implied contract in which estoppel will prevent one party from canceling the
contract Correct Answer: a contract may be created by what a party does or says, without a written
document, and that party is then "estopped" from denying that a contract exists.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Nipsey. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $11.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

75759 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$11.99
  • (0)
  Add to cart