100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Intermediate Systems Acquisitions (ACQ 202) $7.99   Add to cart

Exam (elaborations)

Intermediate Systems Acquisitions (ACQ 202)

 2 views  0 purchase
  • Course
  • Institution

Intermediate Systems Acquisitions (ACQ 202)

Preview 2 out of 9  pages

  • August 26, 2022
  • 9
  • 2022/2023
  • Exam (elaborations)
  • Questions & answers
avatar-seller
Intermediate Systems Acquisitions (ACQ 202)

LORA Correct Answer: Level of Repair Analysis: LORA will ensure that
operational readiness is achieved throughout a system's life cycle in an optimal,
least cost fashion. Starting the LORA process early in a system's development, and
continuous evaluation throughout its life cycle, can ensure LORA influences the
systems design and the maintenance planning by producing an effective support
solution.

LORA considers: Correct Answer: Cost, performance, schedule, and
supportability to aid in finalizing an effective and supportable design solution.

FTA Correct Answer: Fault Tree Analysis: Involves using deductive logic to
determine the possible causes of a defined undesired operational result. It is a top-
down failure analysis of a system that analyzes a series of lower-level events.

RCM Correct Answer: Reliability Centered Maintenance (RCM): consists of a
systematic approach of analyzing system/equipment reliability and system safety
data to determine the feasibility and desirability of preventive maintenance
activities, to highlight maintenance problem areas for design review consideration,
and to establish the most effective preventative maintenance program for a
system/equipment.

Level of repair Analysis (LORA) Correct Answer: The objectives of performing a
LORA is to ensure that operational readiness is achieved throughout a system's life
cycle in an optimal, least cost fashion. Starting the LORA process early in a
system's development, and continuous evaluation throughout its life cycle, can
ensure a LORA influences the systems design and the maintenance planning by
producing an effective support solution.

MTA Correct Answer: Maintenance Task Analysis (MTA): The identification of
the steps, spares and materials, tools, support equipment, personnel skill levels as
well as any facility issues that must be considered for a given repair task. Also
include in the MTA are elapsed times required for the performance of each task.

The Four Prime factors that govern system acquisition programs are: Correct
Answer: Cost, schedule, performance, and supportability.

, Enclosure 6, Section 3 of DoDI 5000.02 requires that the Life-Cycle Sustainment
Plan (LCSP) will: Correct Answer: Describe sustainment influences on system
design and the technical, business, and management activities to develop,
implement, and deliver a product support package.

BIT (built in test) Correct Answer: Component enables the system to conduct a
self-test to determine if the system is functioning properly.

70-80% of a system's entire cost is during the operation and support (O&S) cycle.
Correct Answer:

Reliability defined: Correct Answer: How long an item or system will perform its
function before it breaks. The term MTBF is used to quantify and measure
reliability and is defined in the Capability Development Document (CDD).

Reliability is a mandatory Key Systems Attribute (KSA) for: Correct Answer:
ACAT I programs. For ACAT II programs and below, the user representative
(service sponsor) will determine applicability.

MTTR (Mean Time To Repair) Correct Answer: Used to quantify and measure
maintainability.

Material Availability (Am): Correct Answer: Is a mandatory Key Performance
Parameter (KPP) and is contained in the Capability Development Document
(CDD).

(Am) is defined as: Correct Answer: the measure of the percentage of the total
inventory of a system operational cable of performing an assigned mission given
material condition.

Reliability, maintainability, and supportability are critical factors in achieving:
Correct Answer: maximum Operational Availability (Ao)

The primary purpose of the Future Years Defense Program (FYDP)? Correct
Answer: Display the manpower, force structure, and funding of the DoD.

The Planning, Programming, Budgeting and Execution (PPBE) process provides a
process by which the DoD can: Correct Answer: Identify the fiscal needs of the
services and decide how to allocate resources.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Classroom. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $7.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

77254 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$7.99
  • (0)
  Add to cart