This document contains:
Selection of site– Hydrological cycle / flow measurement , Hydrographs – storage and pondage – losses due to percolation, evaporation and transpiration-Working Principle, General layout and elements of Hydroelectric Power Plant- classification-low, medium and high hea...
SYLLABUS
• Hydroelectric power plant: Selection of site–
Hydrological cycle / flow measurement –
drainage area characteristics – Hydrographs –
storage and pondage – losses due to percolation,
evaporation and transpiration-General layout of
the plant- classification-low, medium and high
head plants pumped storage plants-Typical
layouts – plant auxiliaries – plant operation- spill
ways-Mini and micro hydel power plants
,• The potential for Hydroelectric power in India
is 145300 MW,
• Installed capacity of hydroelectric power in
India is 45699 MW
, Advantages and disadvantages of hydroelectric power plant
Advantages
• 1. No feel requirement
• 2. Low running cost
• 3. No problem of ash disposal
• 3. Pollution free electric generation
• 4. easily switch on and off in a short period
• 5. Greater expectancy of life
• 6. Ancillary benefits: irrigation, flood control, aqua culture.
• 7. Less skilled workers
• 8. Quick response to the change of load
Disadvantages
• High capital cost, power dependent on quantity of water
available, site selection dependent on water availability, long
erection time, disturbed ecology of the area.
, Site selection for hydroelectric power plant
• (i) Availability of water, (ii) Water
storage capacity,
(iii) Available water head, (iv)
Accessibility of site, (v) Distance
from the load centre, (vi) Type of the
land on site, (vii) environmental
aspects,
(Viii) sociological aspects.
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller bynasrivastav. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $3.99. You're not tied to anything after your purchase.