The federal gov't - Correct answer.Who grants the authority to adopt codes?
Performance & prescriptive - Correct answer.What are the two types of construction regulations?
It prohibits alternative methods or materials - Correct answer.An adopted code may become invalid if
_______.
Specification - Correct answer.A written description that spells out the qualitative requirements for
products, materials and workmanship including installation, testing & performance criteria for a
proposed project is known as ________.
Pictorial representations of construction materials - Correct answer.Architectural material symbols are
______.
Alteration to an already approved mechanical installation - Correct answer.What type of work is
specifically allowed to be covered under an annual permit?
Waste and linen collection room in a Group I-2 occupancy containing bins able to hold 15 cubic feet of
material - Correct answer.Which of the following incidental use areas must always be separated from the
main occupancy?
B - Correct answer.A building used for assembly purposes with an occupant load of less than 50 persons
shall be considered a Group _____ occupancy.
,Bedroom - Correct answer.Which of the following rooms would not be permitted to have a ceiling height
of 7 ft 0 inches throughout the room?
The code official - Correct answer.Who shall make interpretations of the IZC?
R-1 - Correct answer.A public park is permitted in a(n) _____ zoning district.
20 - Correct answer.The minimum required rear yard setback in an R-2a zone is ______.
6 months - Correct answer.Generally, a lot or structure occupied by a nonconforming use that has been
vacant for _____ must come into compliance with current zoning code before the structure can be
occupied
Inventory area limited to 25% of area assigned to home occupation - Correct answer.Which of the
following is not a condition of a home occupation?
Preemption - Correct answer.If a state adopts a state building code and prohibits the local municipality
from adopting its own building code, this is known as _____.
Administrative guidelines - Correct answer.Written rules established by a building department that
address applications not expressly resolved by the code are typically known as _____.
Plans examination - Correct answer.One of the most common areas of potential liability in the
department of building safety is _____.
Qualified - Correct answer.The type of immunity usually applied to building safety personnel is _____
immunity
Negligence - Correct answer.Conduct that was not intended to cause harm or injury, but nonetheless did
so, and also breached some duty of care imposed by the law is known as _____.
, A written set of regulations available for adoption by local jurisdictions - Correct answer.What is a model
code
protect the public health safety and welfare - Correct answer.The main purpose of building codes is to
political influence over code regulations - Correct answer.Which is not a benefit of a state code
Final code changes are voted on by all interested parties - Correct answer.Which is not a characteristic of
the ICC code development process
Allows flexibility, provided the final outcome meets the code's intent - Correct answer.A performance
type code
Setting permit and plan review fees - Correct answer.Which of the following is not a service of the ICC?
ICC - Correct answer.Which is not one of the three original model code orginizations?
A law - Correct answer.A building code is adopted by a jurisdiction as
Describes exactly what methods and materials are to be used during construction - Correct answer.A
prescriptive code
By industry orginizations - Correct answer.Standards are primarily developed
A building code - Correct answer.A legal document that regulates the construction of buildings and
structures
A referenced standard - Correct answer.An enforceable extension of the code
1994 - Correct answer.ICC was established as a nonprofit organization in
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller knowledgeNest. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $10.49. You're not tied to anything after your purchase.