FDOT Earthwork Level 1 Exam Questions With Correct Answers Basics covered in Level 1 - answerNuclear Testing Speedy Moisture Report Forms Earthwork has to do with the roadway in what way? - answerEarthwork is the excavation and placement of soils and materials supporting the proposed roadway....

[Show more]

Preview 2 out of 6  pages

  • November 11, 2024
  • 6
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • FDOT Earthwork
  • FDOT Earthwork
avatar-seller
Thebright
©THEBRIGHT EXAM SOLUTIONS

11/05/2024 12:06 PM


FDOT Earthwork Level 1 Exam Questions
With Correct Answers


Basics covered in Level 1 - answer✔Nuclear Testing

Speedy Moisture

Report Forms

Earthwork has to do with the roadway in what way? - answer✔Earthwork is the excavation and
placement of soils and materials supporting the proposed roadway.

In Earthwork what is a lift? - answer✔6" of compacted depth at full width

In Earthwork what is a Lot? - answer✔A lot is 1 lift at 500 ft or within compacted area. Isolated
compaction operations are separate lots.

Sampling at the roadway is done for - answer✔Done for base, sub grade, and embankment.

Sampling is determined how - answer✔generated with random numbers usually by a Verification
Inspector

What is important about sampling at the roadway - answer✔Minimum of three representative sample
combined.

What is LIMS? - answer✔Laboratory Info Management System

The proctor theory is when compaction is achieved how - answer✔by inputting energy to expel air and
water in the soil voids

Compaction causes - answer✔An increase in unit weight, decrease in compressibility and permeability.

The proctor is determined where and creates what - answer✔In a laboratory and establishes a density
standard to be used on the roadway

Lab proctors are created how - answer✔Material is gathered from the road and prepared with different
amounts of water then placed in molds and hammered

What is a modified proctor used in - answer✔It is used in base, sub grade, MSE wall back fill materials

, ©THEBRIGHT EXAM SOLUTIONS

11/05/2024 12:06 PM

Modified proctors are created how - answer✔With a 10lb hammer(rammer) on a 18" drop with 56
blows per layers with 5 layers in total.

What is a standard proctor used in - answer✔It is used in embankment and structure back fill materials

Standard proctors are created how - answer✔With a 5.5lb hammer(rammer) on a 12" drop with 25
blows per layer with 3 layers in total

Comparison between VT and QC density test tolerance - answer✔2 lbs/pcf

What is the STRG - answer✔Sampling, Testing, and Reporting Guide (state wide)

A job guide schedule is - answer✔project specific

The material identification number for embankment in the laboratory is - answer✔004L

The material identification number for embankment in the field is - answer✔004F

The material identification number for base is - answer✔030

PP is short for - answer✔project personel

Sampling in the field it is important to - answer✔sample each type of material and have enough for a
representative sample

When to secure samples - answer✔After material is placed but before compaction effort is applied

Sample transmittal card the source uses what code for the jobsite - answer✔08

For material description the minimum is always - answer✔Color and texture

On sample bags be sure to put - answer✔Project #

Sample #

Location

What is the document that itemizes the minimum requirements for sampling and testing? -
answer✔Sampling, testing, reporting guide

Unit weight is - answer✔the weight of a material occupying a volume

Wet density - answer✔is the weight of soil and water in a volume

Dry density - answer✔weight of soil solids in a volume

Moisture content - answer✔amount of water in the soil in the volume

How does moisture react with soil - answer✔acts as a lubricant permitting maximum densification

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Thebright. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $10.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

62890 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$10.49
  • (0)
  Add to cart