100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
PCC Level 1 Questions and Answers $12.99   Add to cart

Exam (elaborations)

PCC Level 1 Questions and Answers

 3 views  0 purchase
  • Course
  • Pcc
  • Institution
  • Pcc

PCC Level 1 Questions and Answers The end of the temperature sensing portion of the temperature measuring device is submerged a minimum of ___ into the freshly mixed concrete. 3 inches The temperature measuring device shall be capable of accurately measuring the temperature of freshly mixe...

[Show more]

Preview 2 out of 7  pages

  • October 27, 2024
  • 7
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Pcc
  • Pcc
avatar-seller
Pogba119
PCC Level 1 Questions and Answers
The end of the temperature sensing portion of the temperature measuring device is
submerged a minimum of ___ into the freshly mixed concrete. - answer 3 inches

The temperature measuring device shall be capable of accurately measuring the
temperature of freshly mixed concrete to _____ throughout a range of _____ . - answer
1 °F , 30-120°F

The temperature measuring device shall be verified ______, or whenever there is a
question of ______. - answer annually, accuracy

The temperature of concrete may be measured in a wheelbarrow. T or F? - answer T

The temperature of concrete may be measured in a wall form. T or F? - answer T

A composite sample of concrete is required even if the only purpose for obtaining the
sample is to determine temperature. T or F? - answer F

What must be done to the sample container prior to sampling the concrete? - answer
Dampened with water

What must be done to the concrete surrounding the temperature measuring device after
the device is submerged in fresh concrete? - answer Gently press the concrete
around the temperature measuring device at the surface of the concrete.

How long must the temperature measuring device remain in the freshly mixed concrete?
- answer 2-5 minutes

After the temperature of the concrete is read, what is then required? - answer
Reporting of temperature

The temperature of the concrete is reported to the nearest _____. - answer 1°F

According to Test Method C1064, what is one reason to take the concrete temperature?
- answer Verify conformance to a specified requirement for concrete temperature.

A maximum temperature of freshly mixed concrete is specified in Test Method C1064. T
or F? - answer F

The sample of concrete used for temperature determination must be rodded 25 times. T
or F? - answer F

, Sampling by this practice covers procedures for obtaining representative samples, on
which tests are to be performed to determine ____ with quality requirements of the
specification under which the concrete is furnished. - answer Compliance

This practice covers sampling from five types of equipment which are... - answer
Stationary mixers, paving mixers, revolving drum mixers, continuous mixers, and open
top mixers.

The elapsed time between obtaining the first and final portions of a composite sample
shall not exceed ___. - answer 15 minutes

Portions of a composite sample shall be thoroughly remixed before beginning tests on
the sample. T or F? - answer T

Start the tests for slump, temperature, and air content within how many minutes after
obtaining the final portion of the composite sample? - answer 5 minutes

Start molding specimens for strength tests within how many minutes after fabricating the
composite sample? - answer 15 minutes

The concrete sample must be protected from contamination and _____. - answer
Rapid evaporation

The minimum size sample for making strength test specimens is _____. - answer 1
cubic foot

When sampling from a stationary mixer, the batch must be sampled at _____ or more
regularly spaced intervals during discharge of the middle portion of the batch - answer
2

When sampling from a paving mixer, obtain samples from at least ____ different
portions of the pile and combine them into one composite sample for testing purposes. -
answer 5

When sampling from a revolving drum truck mixer, concrete must be sampled at a
minimum of _____ regularly spaced intervals during discharge of the middle portion of
this batch. - answer 2

Concrete samples from a truck mixer must be obtained before any water or admixtures
are added to the mixer at the jobsite. T or F? - answer F

The composite sample from a truck mixer must be obtained form the ____ portion of the
batch. - answer Middle

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Pogba119. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $12.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

72042 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$12.99
  • (0)
  Add to cart