Prime Contractor - Answer The ______asummes the entire responsibility under the contract
Sub Contractor - Answer The ______ asummes responsibility with respect to his portion of the work
6ft - Answer Safety Belts shall be a min of 1/2 inch nylon and not allow a fall greater than ____
...
NC Building Contractor License Prep
Exam Questions 100% Well Answered.
Prime Contractor - Answer The ______asummes the entire responsibility under the contract
Sub Contractor - Answer The ______ asummes responsibility with respect to his portion of the work
6ft - Answer Safety Belts shall be a min of 1/2 inch nylon and not allow a fall greater than ____
8ft - Answer Safety Nets must extend _____ beyond the end of work surface
25ft - Answer Safety Nets must be positioned no more than _____ below work surface
10ft - Answer Heaters must not be located within ______ft of tarps, canvas or similar coverings
10ft - Answer Material Storage : Materials shall not be stored within ____ ft of an exterior wall
7ft - Answer Materaial Storage : Brick stacks shall not be more than _____ft in height
6ft - Answer Material Storage : When masonry blocks are stacked higher than _____ ft the stack shall be
tapered back 1 half block per tier above the ____ft line
20ft - Answer Material Storage : Lumber Piles shall not exceed ______ft in height (mechanically)
16ft - Answer Material Storage - Lumber piles shall not exceed _____ in height (manually)
20ft - Answer A chute is required if waste material is dropped more than _____ft outside exterior walls
of building
,8 Inches - Answer How far do you Lap Durawire
Confined - Answer workers in _____ spaces must be provided a lifeline/safety belt
Catenary Scaffold - Answer means a suspension scaffold consisting of a platform supported by two
essentially horiztonal & parallel ropes attached to structural members of a building or other structure
Prescription Lenses - Answer employer ensures that employees who wear presc lenses while engaged in
operations needing eye protection
12ft - Answer Maximum height of a masonry pier used in a seismic zone is _____
Float (Ship) Scaffold - Answer means a suspension scaffold consisting of a braced platform resin on two
parallel bearers & hung from overhead supports by ropes of fixed length
Lack Of Maintenance - Answer The leading reason for erosion and sediment conrol plan failure is _____
Potable Water & Detergents - Answer To clean masory use _______
Wood Girders : Wood - Answer No Masonry shall be supported on ______ or other forms of _____
construction
Roof Diaphragms : 15 Inches - Answer _______ Shall be anchored to masonry walls with 1/2" diameter
bolts 6ft on center or equivalent. Bolt shall extend & be embedded at least _____ in the masonry
8 Inches - Answer Minimum thickness of a parapet wall
24 Inches - Answer Maximum spacing of light gauge studs
TRUE - Answer Mechanicla connections shall have the bars connection to develop in tension or
compression as least 125% of the yield strength of the bar
,No - Answer Is a hardhat required with a jack hammer?
42" Reflectorized Barrell or Drum - Answer What is preferred safety traffic marker?
A penetrometer - Answer What is used to measure soil bearing capactiy?
Lap durawire 8 inches - Answer Lap durawire 8 inches
3 times - Answer Unreinforced masonry parapet wall heights shall not exceed _____ their thickness
6 Inches - Answer Minimum thickness of a masonry bearing wall - One Story
8 inches - Answer Minimum thickness of a masonry bearing wall - More than One Story
4.5 Sq Ft - Answer There shall be at least one metal tile for each ______ of wall area
24 Inches - Answer Vertical Spacing on Metal Wall Tie
36 Inches - Answer Horiztonal Spacing on Metal Wall Tie
3500 PSI - Answer The minimum compressive strength for a carport slab in severe exposure zone is
_____
Shut Off - Answer hand held power tools (circular saw, chain saw & percussion tools) require a constant
pressure switch that will _____the power when pressure is released
30 PSI - Answer Compressed air shall not be used for cleaning purposes except where reduced to less
than _____ PSI
, Trained - Answer Only employees who have been ____ in the operation of the particular tool in use
shall be allow to operate powder actuated tools
Circular Saws - Answer All Portable, power driven _____ shall be equipped with guards above and
below the base plate or shoe
Upright - Answer Compressed gas cylinders shall be secured in an ______ position at all times
20 Ft - Answer Oxygen Cylinders and fuel cylinders must be stored a minimum of ____ and when in
inside _____ from combustible materials
Inspected - Answer All gas and oxygen hoses must be _____ at the beginning of each work shift
8 and 11 - Answer Unless otherwise required, mix grout to a consistency that has a slumb between
______
Gravel - Answer Sediment Basins must be built over _____
1 Acre or Larger - Answer An erosion and sedimentation control plan must be approved before land
distrubance begins on any site ______
Slopes - Answer Runoff must be diverted across the ______
Acid : Caustic Solutions - Answer Unless otherwise required, do not use ______ or _______
Near The Source - Answer Where is sediment most effectively controlled?
Permanent Ground Cover - Answer A ______ sufficient to control erosion must be installed within 30
working days or 120 calendar days whichever is less after the construction is complete
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller TestSolver9. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $10.39. You're not tied to anything after your purchase.