All tanks must have: - Answer 2 compartments
All tanks whether pre-manufactured or constructed on site shall be constructed so that the length is ___________ compared to the width. - Answer at least one and one- half (1 1/2) times... "to the width."
Septic Tanks may be made of: - Answer...
Commercial Septic System Installer Pro
Exam Questions Answered Correctly.
All tanks must have: - Answer 2 compartments
All tanks whether pre-manufactured or constructed on site shall be constructed so that the length is
___________ compared to the width. - Answer at least one and one- half (1 1/2) times... "to the
width."
Septic Tanks may be made of: - Answer Concrete, Plastic, fiberglass, or other materials as approved by
the department.
Tank compartment partitions will be located: - Answer Not less than two-thirds or more than three-
fourths the Length of the tank from the Inlet end.
Compartment partitions will be constructed so a pass-thru hole or slot equal to or greater than the
diameter of the inlet pipe is positioned below the liquid surface with a
_____________________________. - Answer Minimum 25% to a maximum of 50% of the total liquid
depth.
Total liquid depth for larger poured-in-place tanks shall have a maximum of ______________inches -
Answer 66 inches
True or False: Walls and bottom of poured-in-place septic tanks must be reinforced. - Answer True
How can a Septic tank be reinforced? - Answer six inch by 6 inch (6"x6") No.10 gage welded steel
reinforcing wire OR fibrous reinforcing material conforming to ASTM specifications for such materials.
How must Tank Lids be Reinforced? - Answer using three-eights steel reinforcing rods (rebar) which
shall be spaced twelve inches (12") on center each way extending a minimum of two and one half (2
1/2") inches and a maximum of three (3") from the outside edge of the tank lid.
, In general, the tank must be able to withstand a uniform live load of ______________________ pounds
per square foot in addition to all loads to which an underground tank is normally subjected. - Answer
150
True or False: Walls, bottoms, and lids of poured-in-place septic tanks should have a minimum thickness
of four inches (4"). - Answer True
Tank lids shall be constructed in ______________________ pieces and shall have securable, removable
access openings located so that the inlet and outlet tees can be ________________________________.
- Answer one or two,
readily accessed.
Access opening shall have a minimum of _________________ and maximum of ___________________
free space. - Answer Minimum: 15"
Maximum: 24"
Tanks with more than 12 inches of cover must extend access openings to within ______ inches of the
ground surface. - Answer 12
All tanks shall be equipped with ________________________________ rated or equivalent tees at the
inlet and outlet ends of the tank. - Answer Four inch (4") PVC, ASTM 3034
Tees shall be constructed so they extend into the liquid a minimum of ____________________ and a
maximum of __________________ of the liquid depth of the tank. - Answer Min: 25%
Max: 50%
The invert of the outlet tee shall be located _______________ inches below the invert of the inlet tee. -
Answer two inches
__________________ tees shall be equipped with an approved effluent filter. - Answer Outlet
Concrete used for poured-in-place or pre-cast septic tanks shall have a minimum
________________________. - Answer 28 day compressive strength of 4000 pounds per square inch.
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller COCOSOLUTIONS. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $9.79. You're not tied to anything after your purchase.