100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
NCCCO SIGNAL PERSON TEST QUESTIONS AND ANSWERS $11.49   Add to cart

Exam (elaborations)

NCCCO SIGNAL PERSON TEST QUESTIONS AND ANSWERS

 7 views  0 purchase
  • Course
  • NCCCO
  • Institution
  • NCCCO

NCCCO SIGNAL PERSON TEST QUESTIONS AND ANSWERS

Preview 2 out of 5  pages

  • September 7, 2024
  • 5
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • NCCCO
  • NCCCO
avatar-seller
biggdreamer
NCCCO SIGNAL PERSON TEST
QUESTIONS AND ANSWERS
Continuously - Answer-during all crane movements, asme b30.5 states that
communication shall be maintained

Stop crane movements - Answer-if the communication is disrupted at any time while the
crane is operation, the operator shall

Osha 1926.1400 appendix a - Answer-OSHA's standard method crane hand signals
would be located in the following

Designated person - Answer-according to asme b30.5 prior to qualifying all signal
persons they must be tested by?

None - Answer-what should be the response of the operator if the signal is not
understood

Posted conspicuously - Answer-according to asme b30.5 where must a hand signal
chart be posted

Lift director, signalman and operator - Answer-when using voice signals according to
asme b30.5 who must be present for the pre lift discussion

Limitations - Answer-a qualified signal person must have knowledge of the standard
hand and voice signals along with a basic understanding of crane operations and

Tested - Answer-according to osha 1926.1419 before lifting operations begin
communication systems shall be

Identify each other - Answer-prior to commencing a crane lift the operator and
signalperson shall

Perspective - Answer-any direction given to the crane operator by the signal person
shall be given from the operator

Function and direction - Answer-what is the first element of voice signals given to a
crane operator prior to the lift

Three - Answer-according to osha and asme b30.5 each series of voice signals contain
how many elements

Lift director - Answer-for lifting operations using voice signals who has the responsibility
of permitting multiple simultaneous crane functions

, Standard signals - Answer-according to asme b30.5 special signals cannot conflict with

Back up - Answer-if the operator sounds three short audible signals while loving the
crane he/she intends to

Stop - Answer-if the operator sounds one short audible signal while moving the crane
he/she intends to

Job site location - Answer-according to asme b30.5 ant audible emergency signal must
be agreed upon at each

Go ahead - Answer-if the operator sounds two short audible signals while move crane
he/she intends to

Hard wire radio - Answer-when signaling a tower crane which of the following is most
reliable

Asme b30.3 - Answer-according to asme which volume listed below must be used to
hand signal a tower crane

Asme b30.5 - Answer-according to asme which volume listed below must be used to
hand signal a mobile crane

10 feet w/encroachment precautions - Answer-according to osha 1926.1408 the
minimum clearance between any part of the crane and power lines rated 50kv or below
shall be

10 feet w/encroachment precautions - Answer-according to osha 1926.1408 for power
lines rated 100kv the minimum clearance between the crane and any lines shall be

6 - Answer-osha 1926.1411 when you encounter power lines with a voltage of 44kv and
the crane is in transit you must keep a minimum clearance of how many feet

10 - Answer-according to osha 1926.1411 when the crane is in transit and the power
lines you are to go under are rated at 300kv what minimum clearance must you
maintain

Signal person - Answer-osha 1926.1401 a dedicated spotter must also have the
qualifications of a

Utility owner/operator - Answer-overheard power lines shall be considered energized
authorization that the lines are deenergized must be given by whom

Anti two block - Answer-according to osha 1926.1431 when signaling a crane that is
lifting a personnel platform which device listed below must be attached to the crane

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller biggdreamer. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $11.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

62890 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$11.49
  • (0)
  Add to cart