100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
NCARB practice problems Questions and Answers 100% Correct $17.99   Add to cart

Exam (elaborations)

NCARB practice problems Questions and Answers 100% Correct

 2 views  0 purchase
  • Course
  • NCARB - National Council of Architectural Registration Boards Certified
  • Institution
  • NCARB - National Council Of Architectural Registration Boards Certified

NCARB practice problems

Preview 2 out of 9  pages

  • August 19, 2024
  • 9
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • NCARB - National Council of Architectural Registration Boards Certified
  • NCARB - National Council of Architectural Registration Boards Certified
avatar-seller
jw638729
NCARB practice problems

Public - answer Which of the following methods of bidding is required on most projects
for which government funds are to be used?

A. Direct
B. Negotiated
C. Invited
D. Public

Fast track - answer Which of the following project delivery methods always requires
preparation of several individual bid-document packages?

A. Design-Bid-Build
B. Fast Track
C. Design Build
D. Turnkey

Specifications - answer diagram on paper

recommend qualified contractors - answer In developing a list of bidders for a private
project, the architect's role is to

A. select the contractor
B. recommend qualified contractors
C. rank the contractors in order of preference
D. discourage owner-recommended contractors

surety - answerA contractor's ability to obtain a performance bond for a specific contract
is determined by the

A. owner
B. architect
C. contractor
D. surety

Financial statment - answerAIA Document A305, Contractor's Qualification Statement,
requires which of the following supplemental documents to be provided by the
applicant?

A. financial statement
B. list of subcontractors

, C. list of proposed consultants
D. list of proposed material suppliers

Has the right to waive irregularities and accept the bid - answerAfter considering all the
bids, the owner favors a bid with irregularities. According to AIA Document A701,
Instructions to Bidders, the owner has which of the following rights/responsibilities
regarding an irregular bid?

A. Has the right to waive irregularities and accept the Bid
B. Has the right to extend the bidding period for corrections
C. Must informally request corrections from the bidder
D. Must only consider bids without irregularities

multiple prime contracts - answerA local bank has a budget of $30,000,000 to construct
a new main office. The bank wants to use contractors who are customers of the bank;
however, none of the bank's contractor customers can bond the entire amount of the
contract. Which of the following delivery methods would be best suited to meeting the
bank's contractor selection goal?

A. Design-Build
B. Fast-Track
C. Multiple-Prime Contracts
D. Additive change Orders

notification of future addenda - answerWhich of the following is an appropriate item for
the prebid conference?

A. Occupancy-permit procedures
B. Notification of future addenda
C. Pre-commissioning procedures
D. Status of Change Orders

The contractor is required to replace the lighting fixtures wiht the fixtures specified
without remibursement - answerA contractor under a fixed-price construction contract
has allowed the electrical subcontractor to install lighting fixtures other than those stated
in the contract documents. The electrical subcontractor and the contractor both believe
the substituted fixtures to be of equal value. The construction is substantially completed
and the architect rejects these fixtures. According to AIA Document A201, General
Conditions, which of the following actions must be taken regarding the lighting fixtures?

A. The architect must accept the lighting fixtures as installed without a cost credit to the
owner.
B. The architect must accept the lighting fixtures as installed but with a cost credit to the
owner.
C. The contractor is required to replace the lighting fixtures with the fixtures specified
without reimbursement.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller jw638729. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $17.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

76669 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$17.99
  • (0)
  Add to cart