100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
BOMI The Design, Operation, And Maintenance of Building Systems, Part I: Qs And As $9.99   Add to cart

Exam (elaborations)

BOMI The Design, Operation, And Maintenance of Building Systems, Part I: Qs And As

 12 views  0 purchase
  • Course
  • BOMI
  • Institution
  • BOMI

BOMI The Design, Operation, And Maintenance of Building Systems, Part I: Qs And As

Preview 2 out of 7  pages

  • August 13, 2024
  • 7
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • BOMI
  • BOMI
avatar-seller
LeCrae
BOMI The Design, Operation, And Maintenance of
Building Systems, Part I: Qs And As

Restoration of property to satisfactory conditions without changing the plan,
form, or style of a structure Right Ans - Rehabilitation

Bringing a property into conformity with changes in style, whether interior or
exterior Right Ans - Modernization

To change the plan, form, or style of a structure to correct functional or
economical deficiencies Right Ans - Remodeling

Temporary changes to the plan, form, or style of a structure Right Ans -
Alterations

Architectural firm is hired and serves as the owners agent. Their primary
responsibility is providing and managing the design and construction
documents for the project; traditional method. Right Ans - Design-Bid-
Build

Uses separate contracts for the design and construction phase of the project.
May be architect-led, contractor-led, integrated-led, or proprietary; unlike
traditional methods. Right Ans - Design-Build

When the owner contracts separately with a designer and a contractor, and is
often chosen in straight forward projects where the owners wants strong
control, but operates with minimal staff; similar to design-bid-build. Right
Ans - Construction Management-at-Risk (CMAR)

When an owner divides a project into two or more parts and then enters into
a separate contract for each part. Often used for large, complex construction
projects that require phases and multiple bid packages. Right Ans -
Multiple Prime Contracts

Provides information during a bid that adds, deletes, or clarifies information
in contract documents Right Ans - Addenda

, Usually between an owner and contractor, design professional, or
construction manager. Contractor is reimbursed for their direct and indirect
costs and is paid a fee for their service. Right Ans - Cost-plus Contract

The construction manager guarantees, in addition to providing administrative
construction management services, a ceiling price to the owner for the cost of
construction. Right Ans - Guaranteed Maximum Price-Construction
Management (GMP-CM)

Between the owner and contractor wherein the owner agrees to pay the
contractor a specified sum of money for completing a project consisting of a
variety of specified items of work. Results in low construction costs with
minimal change orders. Right Ans - Lump Sum Contract

Set contract amount for all labour, materials, equipment, and services and
contractors overhead and profit for all work being performed for a specific
project. Includes fixed prices for services, materials, labour, and local costs
reimbursable. Right Ans - Unit Price Contract

What are the biggest causes of project failure? Right Ans - Poor estimating
and scheduling

What is the most common used project schedule? Right Ans - Critical Path
Method (CPM) Scheduling

Owner/agent orders a change in the project Right Ans - Actual change

A change in a project is a made due to errors/emissions Right Ans -
Constructive change

An owner disrupts work in a project Right Ans - Disruptive change

Lime cement that sets by combining water Right Ans - Hydraulic

Lime cement that hardens by drying out Right Ans - Nonhydraulic

Lime cement that mainly needs to dry out, but has some hydraulic properties
Right Ans - Semihydraulic

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller LeCrae. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $9.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

77254 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$9.99
  • (0)
  Add to cart