100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
SWM Inspector Knowledge Check questions and answers $14.49   Add to cart

Exam (elaborations)

SWM Inspector Knowledge Check questions and answers

 2 views  0 purchase
  • Course
  • SWM DEQ
  • Institution
  • SWM DEQ

SWM Inspector Knowledge Check questions and answers

Preview 2 out of 6  pages

  • August 13, 2024
  • 6
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • SWM DEQ
  • SWM DEQ
avatar-seller
BRAINBOOSTERS
SWM Inspector
Knowledge
Check questions
and answers
Which two plans in the SWPPP must be approved? - answer ESC
plan and SWM plan


Does the SWM plan address runoff during construction or after? -
answer Post-construction


What impact does impervious cover have on water quality? -
answer More impervious cover means more stormwater runoff
(increased volume and velocity) that can pick up pollutants and
be carried to streams, impacting water quality


What is the target pollutant in the water quality criteria? - answer
Phosphorus


What is the lower limit of the range of imperviousness that can
result in stream degradation? - answer 10%

, The SWM regulation ensures water quantity is considered in
stormwater management planning to protect against which two
destructive forces? - answer Channel erosion and flooding


How does the rate of runoff changes after development? - answer
In a pre-development watershed, the peak discharge gradually
increases and gradually declines. In a post-development
watershed, the peak discharge increases much faster and to a
much higher amount (2-5x) than pre-development conditions and
declines much more abruptly. This is due to more impervious
cover in post-development and could potentially cause erosion
and flooding.


A locality VSMP must be at least as stringent as what state
permit? - answer Construction General Permit (General VDPES
Permit)


What plans must a locality's ordinance require to be submitted
and approved? - answer An approved ESC and SWM plan


List three violations for which a penalty may be imposed. - answer
Any of the following:
- no state permit
- no SWPPP
- incomplete SWPPP
- SWPPP not available for review
- no approved ESC plan
- failure to install E&S controls or stormwater BMPs
- failure to properly install or maintain E&S controls or stormwater
BMPs

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller BRAINBOOSTERS. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $14.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

79650 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$14.49
  • (0)
  Add to cart