100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
PJM Generation Cert. $7.99   Add to cart

Exam (elaborations)

PJM Generation Cert.

 3 views  0 purchase
  • Course
  • Institution

PJM Generation Cert.

Preview 3 out of 19  pages

  • July 2, 2024
  • 19
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
avatar-seller
PJM Generation Cert


Actions in low voltage alert? - ANS-Review transmission & generation outages
Request reactive reserve check

Heavy load voltage schedule warning purpose is to have members prepare far max
support of voltages on the? - ANS-Bulk Power System

Manual load dump warning & reduction of Non-critical plant load issued when? -
ANS-Primary reserve is less the the largest generating unit.
Loss of transmission facility jeopardize reliability after all possible measures have been
taken to increase reserves

Hot weather alert - ANS-COMED 90
DOM & EKPC 95

PJM issues high system voltage message - ANS-Gen operators should operate the
lower end of their voltage bandwidth

Primary reserve warning - ANS-Ensure deffer able Maintenance is halted

General actions PJM takes when conservating ops initiated? - ANS-Purchase/load
additional reserves
begin studying double contingencies
Lower IROL
Increase # of SOS calls

Purpose of heavy voltage schedule action is to increase reactive reserves - ANS-EHV
system

National terrorism advisory system 2 types of alerts? - ANS-Elevated threat
Imminent threat

Non-critical plant load - ANS-lighting, office area a/c

Purpose of capacity emergency warning? - ANS-keep members informed of actual
capacity shortages or contingencies that may jeopardize reliability during RT ops

,keep all affected system personnel aware of the forecast and actual status of the PJM
RTO

Heavy load voltage schedule action - ANS-Gen operators- maintain MVAR reserve on
units connected to EHV

During cold weather action - ANS-Assume an unavailability rate for scheduled
generation

During terrorism/sabotage emphasis on? - ANS-Operations & communications

For voltage support TOs can request? - ANS-Generators stay online

During Restoration what is removed from service until sufficient load restored to
maintain voltage - ANS-Shunt capacitors

Freq change=(load change/connected capacity)X Gov droop in percentage - ANS-

LMP calculated day ahead market - ANS-Every hour
RT every 5mins

Penalty factor - - ANS-incremental loss for a bus used to include the effect of losses on
the dispatch

All call types - ANS-Operational, Emergency Messages, Informational

Voltage reduction Alert- - ANS-Est. operating reserve capacity is less than forecasted
synchronized reserve equipment

Generation owners - ANS-Must handle environmental Alerts

Emergency requires action to? - ANS-Maintain freq prevent load loss, ensure safety and
reliability

Alerts - ANS-Advance of operating day

Warning & actions - ANS-During that day

Emergency situation - ANS-Implement procedures within 30min

, STE- Short term emergency rating - ANS-

Low voltage alerts - ANS-Analyze reactive capabilities
Reactive reserve check

Heavy load voltage schedule warning - ANS-4 hrs prior

Heavy load voltage schedule action - ANS-500kv (UHV system) support- EHV
Place caps online
Reactors removed
AVR online

High system voltage - ANS-caps out/reactors in

Manual load dump&reduction of non-critical load - ANS-issued when available primary
reserve capacity less than largest Gen or Trans

For voltage support PJM can request generator adjustments - ANS-Direct adversely
affect MW%
Generator to come online for voltage support
Remain online when scheduled to come offline

Unit startup notification Alert - ANS-Place Gen units ready to be started in 48hrs

Voltage reduction - ANS-2.5%-5%

Min Gen Alert implemented when - ANS-The expected gen level is within 2500mw of
normal min energy limits include
Adjusted min generation, valley & load est, margin values

Min Gen Value - ANS-Economic Min- Emergency Min= ERG
ERG- emergency reducible generation

Temperature for cold weather Alert - ANS-10 degress

During suspected terrorism - ANS-emphasis on operation and communication

NOAA issues alert at - ANS-K-5 or higher

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller EXAMQA. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $7.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

76669 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$7.99
  • (0)
  Add to cart