The footing or anchorage for scaffolds must be capable of carrying the maximum intended load without:
A. Diagonal bracing
B. Cross bracing
C. Tying or guying
D. Settling or displacement
C. Tying or guying
Erectors of a scaffold who exposed to potential falling object hazards shall be provided...
the footing or anchorage for scaffolds must be cap
erectors of a scaffold who exposed to potential fa
osha requires a rest landing at intervals not exce
the top handrail of a scaffold must be able to
Written for
NCCER/OSHA Scaffold part 2
All documents for this subject (1)
Seller
Follow
munyuabeatrice92
Content preview
NCCER/OSHA Scaffold part 2 CORRECT
GRADE A+ SOLUTIONS
The footing or anchorage for scaffolds must be capable of carrying
the maximum intended load without:
A. Diagonal bracing
B. Cross bracing
C. Tying or guying
D. Settling or displacement
C. Tying or guying
Erectors of a scaffold who exposed to potential falling object
hazards shall be provided with:
A. Static erectors
B. Overhead protection
C. Mono goggles
D. Full faced shields
B. Over head protection
Previous
Play
Next
Rewind 10 seconds
Move forward 10 seconds
Unmute
0:01
/
0:15
Full screen
Brainpower
Read More
Osha requires a rest landing at intervals not exceed:
A. 35 feet
B. 40 feet
C. 45 feet
D. 50 feet
A. 35 feet
The top handrail of a scaffold must be able to withstand how many
pounds of pressure?
A. 125
B. 150
C. 175
D. 200
,D. 200
When Building a scaffold inside a "goggle area"
A. The scaffold builder must wear goggles only in the ground
B. Everyone inside the area must wear goggles
C. Only the worker in the bottom must wear goggles
D. The scaffold builder must wear safety glasses
B. Everyone inside the area must wear goggles
The ladder should be located on a mobile scaffold will not
A. Tip over
B. Roll away
C. Move about
D. Shake violently
A. tip over
When should ties be installed?
A. During the erection process
B. Immediately after erection is completed
C. When required by a foreman
D. When the scaffold will remain more than one work shift
A. During the erection process
What body produces the primary Code or regulations guiding the
scaffolding industry?
A. ANSI (American National Standards Institute)
B. OSHA (Occupational safety and healthy agency)
C. SIA (Scaffold Industry Association)
D. SSFI (Scaffold, Shoring, and Forming Institute)
B. OSHA (Occupational Safety and Healthy Agency)
What should be used to erect scaffolding on uneven ground?
A. Solid bricks
B. Putlogs
C. Leveling Jacks
D. adjustment tubes
C. Leveling Jacks
OSAH specifically prohibits the use of?
A. Two point suspension swinging scaffolds
B. Outrigger scaffolds
C. Lean to scaffold
D. Full face shield
C. Lean to scaffolds
Boards or wooden pad placed on the soil to support scaffold legs are?
A. Leg mats
B. Mudsills
C. Mud maes
D. Levelers
, B. Mudsills
The tube of a tube and clamp scaffold is normally what size O.D.?
A. 1.2 inches
B. 1.4 inches
C. 1.9 inches
D. 3.9 inches
C. 1.9 Inches
Scaffold decks that overlap a minimum of how many inches, unless
secured in some other way?
A. 8
B. 12
C. 18
D. 24
B. 12
the bearer in a tube and clamp scaffold is always?
A. Placed below the adjacent runner
B. Vértice or plumb
C. Placed above the adjacent runner
D. Kept close to the ground
C. Placed above the adjacent runner.
What must a rolling scaffold have on each caster or roller?
A. Steering device
B. Positive Locking device
C. Height adjustment device
D. Grounding point
B. Positive locking device
Who must inspect a scaffold each work shift and after any occurrence
which could effect a scaffold's structural integrity?
A. Foreman
B. Competent person
C. Any scaffold crew member
D. Project engineer
B. Competent person
What is the minimum tensile strength of D-rings and snap hooks on a
safety harness?
A. 3500 pounds
B. 4000 pounds
C. 4500 pounds
D. 5000 pounds
D. 5,000 pounds
What part of the picture is identified by the letter "G"?
A. Sill or mudsill
B. Planking
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller munyuabeatrice92. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $16.49. You're not tied to anything after your purchase.