100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
NCTI MT1-MT2: QUESTIONS AND ANSWERS $12.99   Add to cart

Exam (elaborations)

NCTI MT1-MT2: QUESTIONS AND ANSWERS

 14 views  0 purchase
  • Course
  • Institution

NCTI MT1-MT2: QUESTIONS AND ANSWERS

Preview 2 out of 15  pages

  • June 11, 2023
  • 15
  • 2022/2023
  • Exam (elaborations)
  • Questions & answers
avatar-seller
NCTI MT1-MT2: QUESTIONS AND ANSWERS
According to SCTE- and NCTA- recommended trunk system map symbols,
fiber-optic cable is represented by Correct Ans - Double arrows within
a small circle on a solid line.

The forward path signal in a traditional tree-and-branch architecture
Correct Ans - originates at the headend and is transmitted downstream
through coaxial trunk cable and trunk amplifier.

In a HFC network, Correct Ans - Processing equipment in the headend
converts the forward RF signal to a light signal.

During aerial plant construction, Correct Ans - The strand is tensioned
so its sag profile matches that of the overhead utility power lines.

With underground plant construction, Correct Ans - The fiber-optic
and coaxial cables are often places underground with other utility lines to
jointly share construction costs.

Standby power supplies Correct Ans - continue providing an output
voltage even during a utility power outage by using a back up power source.

Centralized power configurations Correct Ans - provide the advantage
of increased reliability through sharing of expensive backup generators and
sophisticated monitoring equipment among different power realms.

When transmitting broadband signals Correct Ans - In a two way
hybrid fiber/coax (HFC) network, two or more individual optical fibers are
required for each optical node location.

RF trunk amplifiers Correct Ans - Have attenuator pads, equalizers,
and duplex filters that control and route the RF signals.

Verifying plant reliability includes Correct Ans - Frequency response
sweeping, which is adjusting RF amplifier circuits to amplify all frequencies in
the bandpass spectrum as equally as possible

, Which of the following is a requirement in the process for measuring leakage
using a dipole antenna, as required by the FCC? Correct Ans - The
antenna must be placed 3 meters from the system components and 3 meters
from the ground.

Many cable companies require which type of leaks to be fixed? Correct
Ans - All types of leaks must be fixed.

According to the FCC, the leakage log should contain which of the following?
Correct Ans - The probable cause of the leakage.

Which of the following FCC required information must a cable system keep on
file for two years? Correct Ans - Annual CLI calculations, regular
(quarterly) monitoring programs, and a list of all channels used in the
aeronautical bands.

If your leakage detector indicates there is a leak and displays a reading of 14
microvolts per meter (uV/m) when you are 80 feet from a possible leak
source, what is the approximate calculated level of the leak from 10 feet?
Correct Ans - 112 uV/m.

If a large signal leak is found in the aerial plant, what is a good first step in
locating the leak? Correct Ans - Drive around until an absolute peak is
found.

Which of the following best describes demand maintenance procedures with
regard to signal leakage? Correct Ans - The demand maintenance
procedures can improve the CLI measurement results by identifying and
correcting the largest leaks first.

When troubleshooting signal leakage in the drop system, what is indicated if
all signs of signal leakage disappear when the ground block is disconnected
and terminated on the side connected to the customer premises? Correct
Ans - The backward route from the ground block to the tap can be
eliminated as a source of The backward route from the ground block to the
tap can be eliminated as source of leakage.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Studyhall. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $12.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

67096 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$12.99
  • (0)
  Add to cart