OPS 571 Final Exam ALL ANSWERS 100% CORRECT SPRING FALL-2022 SOLUTION GUARANTEED GRADE A+
0 view 0 purchase
Course
OPS 571 (OPS571)
Institution
University Of Phoenix
1. Which of the following is considered a major process flow structure?
• Lead Time
• Fabrication
• Lean Manufacturing
• Project
2. ISO audits result in certifications that are done by first, second, or third parties. Which of the following result in the best certification of a firm?
...
1 which of the following is considered a major process flow structure
2 iso audits result in certifications that are done by first
or third parties which of the
Written for
University Of Phoenix
OPS 571 (OPS571)
All documents for this subject (7)
Seller
Follow
Allan100
Reviews received
Content preview
OPS 571 Final Exam ALL ANSWERS 100% CORRECT
SPRING FALL-2022 SOLUTION GUARANTEED GRADE
A+
1. Which of the following is considered a major process flow structure?
• Lead Time
• Fabrication
• Lean Manufacturing
• Project
2. ISO audits result in certifications that are done by first, second, or third parties. Which of
the following result in the best certification of a firm?
• Certification is sought by any firm assuming they pay annual dues.
• 2nd Party – where a customer audits its supplier
• 3rd Party – where a qualified national or international standards/certifying
agency serves as an auditor
• 1st Party – where a firm audits itself against ISO standards
3.Which of the following is ISO 14000 primarily concerned with?
• Quality management
• Time management
• Continuous improvement management
• Environmental management
4. Which is the one correct value stream principle?
• Look for efficiencies in the factory, office, physical, procedural, and technical
operations.
• Eliminate waste that stops, slows down, or diverts the value stream.
• Concentrate on speeding up value-adding operations rather than removing waste.
• Keep the value stream moving at minimum velocity.
5. What is the starting point in developing a capacity plan for a health care operation?
• Determining the effective capacity over time
• Estimating design capacity
• Forecasting patient demand for a reasonable length of time
• Discovery of the bottleneck operation
, 6. Which of the following is considered an organizational blueprint, which prescribes the
quantity and time frame for when each end product will be assembled?
• MRP (Material Requirements Plan)
• ERP (Enterprise Resource Planning)
• MPS (Master Production Schedule)
• WBS (Work Breakdown Structure)
7.Which of the following is an element that addresses elimination of waste under lean
production?
• Kanban production control system
• Production ahead of demand
• Minimized run times
• Group plant loading technology
8. In most cases, demand for products or services can be broken into several components.
Which of the following is considered a component of demand?
• Level elements
• Future elements
• Past elements
• Cyclical elements
9. Design for manufacturing and assembly delivers product improvements by emphasizing
which of the following:
• Reducing product quality during the assembly process
• Designing products so they can be manufactured by a virtual factory
• Reducing equipment in the production process
• Simplification of the product by reducing the number of separate parts
10. Which of the following is one of the principles of reengineering?
• Quality at the source
• Do not select suppliers on the basis of price alone.
• Have those who use the output of a process perform the process.
• Leverage high cost employees with lower cost employees.
11. Which of the following is a characteristic that can be used to guide the design of service
systems?
• Services are all similar.
• Services businesses are inherently entrepreneurial.
• Quality work means quality service.
• Services cannot be inventoried.
12. Considering Hau Lee’s uncertainty framework for classifying supply chains, which of the
following is given to a supply chain which has an evolving supply process based on
functional products?
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller Allan100. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $12.99. You're not tied to anything after your purchase.